Jessica Lessin
RT @stevelevine: Scoop: Anduril wanted a new six-building manufacturing complex near Long Beach Airport up and running by March 1, 2027. But Southern California Edison couldn't have enough grid power ready by then. That problem opened the door to Critical Loop, a startup founded by SpaceX and Palantir veterans, landing its first contract to provide temporary battery backup to giant industrial users. The Electric.
0310122



